IRS/2024/4619/PON2
Notification details
Status | In review |
---|---|
First observed date | 14 June 2024 |
First observed time | 16:00 |
Organisation involved | TOTALENERGIES E&P UK LIMITED |
Installation | Alwyn North NAB Platform |
Field | ALWYN NORTH |
Latitude | 60° 48' 31.0'' N |
Longitude | 1° 44' 8.0'' E |
Quadrant / block no. | 3 / 9 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|