IRS/2024/4957/PON2
Notification details
Status | In review |
---|---|
First observed date | 03 September 2024 |
First observed time | 14:15 |
Organisation involved | ANCALA MIDSTREAM ACQUISITIONS LIMITED |
Installation | SAGE Pipeline |
Field | N/A |
Latitude | 57° 35' 32.603'' N |
Longitude | 1° 47' 31.415'' W |
Quadrant / block no. | 19 / 12 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|