IRS/2024/5077/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 29 September 2024 |
| First observed time | 11:05 |
| Organisation involved | ENQUEST HEATHER LIMITED |
| Installation | Heather A Platform |
| Field | HEATHER |
| Latitude | 60° 57' 13.0'' N |
| Longitude | 0° 56' 22.0'' E |
| Quadrant / block no. | 2 / 5 |
Breached conditions details
| Materials likely to float on sea surface or in water column | Yes |
|---|---|
| Materials lost to sea resting on sea bed | No |
Formal investigation
| Formal investigation ever opened | No |
|---|