Back

IRS/2024/5223/PON2

Notification details

Status In review
First observed date 01 November 2024
First observed time 06:30
Organisation involved TOTALENERGIES E&P UK LIMITED
Installation Elgin PUQ Platform
Field ELGIN
Latitude 57° 0' 7.0'' N
Longitude 1° 50' 3.0'' E
Quadrant / block no. 22 / 30

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No