IRS/2024/5365/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 25 November 2024 |
| First observed time | 17:20 |
| Organisation involved | CHRYSAOR LIMITED |
| Installation | Everest North Platform |
| Field | EVEREST |
| Latitude | 57° 45' 5.0'' N |
| Longitude | 1° 48' 5.0'' E |
| Quadrant / block no. | 22 / 9 |
Breached conditions details
| Materials likely to float on sea surface or in water column | Yes |
|---|---|
| Materials lost to sea resting on sea bed | No |
Formal investigation
| Formal investigation ever opened | No |
|---|