IRS/2025/5948/PON2
Notification details
Status | In review |
---|---|
First observed date | 16 March 2025 |
First observed time | 22:30 |
Organisation involved | PETROGAS NORTH SEA LIMITED |
Installation | Noble Resilient |
Field | ABBEY |
Latitude | 53° 56' 4.6'' N |
Longitude | 0° 31' 21.0'' E |
Quadrant / block no. | 47 / 3 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|