IRS/2025/5980/PON2
Notification details
Status | Completed |
---|---|
First observed date | 26 March 2025 |
First observed time | 07:30 |
Organisation involved | BP EXPLORATION OPERATING COMPANY LIMITED, NOBLE DRILLING UK LTD |
Installation | Ocean GreatWhite |
Field | SCHIEHALLION |
Latitude | 60° 22' 53.514'' N |
Longitude | 4° 5' 46.388'' W |
Quadrant / block no. | 204 / 20 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | Yes |
Formal investigation
Formal investigation ever opened | No |
---|