IRS/2025/5997/PON2
Notification details
Status | Completed |
---|---|
First observed date | 30 March 2025 |
First observed time | 09:18 |
Organisation involved | SPIRIT ENERGY PRODUCTION UK LIMITED |
Installation | CPC |
Field | SOUTH MORECAMBE |
Latitude | 53° 50' 48.21'' N |
Longitude | 3° 34' 50.78'' W |
Quadrant / block no. | 110 / 2 |
Breached conditions details
Materials likely to float on sea surface or in water column | No |
---|---|
Materials lost to sea resting on sea bed | No |
Formal investigation
Formal investigation ever opened | No |
---|