IRS/2025/5997/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 30 March 2025 |
| First observed time | 09:18 |
| Organisation involved | SPIRIT ENERGY PRODUCTION UK LIMITED |
| Installation | CPC |
| Field | SOUTH MORECAMBE |
| Latitude | 53° 50' 48.21'' N |
| Longitude | 3° 34' 50.78'' W |
| Quadrant / block no. | 110 / 2 |
Breached conditions details
| Materials likely to float on sea surface or in water column | No |
|---|---|
| Materials lost to sea resting on sea bed | No |
Formal investigation
| Formal investigation ever opened | No |
|---|