Back

IRS/2025/6548/PON2

Notification details

Status In review
First observed date 11 August 2025
First observed time 23:30
Organisation involved NEO ENERGY RESOURCES UK LIMITED
Installation Piper B Platform
Field PIPER
Latitude 58° 27' 40.86'' N
Longitude 0° 15' 3.83'' E
Quadrant / block no. 15 / 17

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No