Back

IRS/2025/6776/PON2

Notification details

Status Completed
First observed date 04 October 2025
First observed time 08:30
Organisation involved DANA PETROLEUM (E&P) LIMITED
Installation Triton FPSO
Field BITTERN
Latitude 57° 5' 2.0'' N
Longitude 0° 53' 38.0'' E
Quadrant / block no. 21 / 30

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No