Back

IRS/2025/6886/PON2

Notification details

Status In review
First observed date 26 October 2025
First observed time 07:30
Organisation involved NEO NEXT ENERGY LIMITED
Installation Montrose A Platform
Field MONTROSE
Latitude 57° 26' 59.46'' N
Longitude 1° 23' 12.5'' E
Quadrant / block no. 22 / 17

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No