IRS/2025/7053/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 04 December 2025 |
| First observed time | 12:50 |
| Organisation involved | ITHACA (NE) E&P LIMITED |
| Installation | Cygnus B Platform |
| Field | CYGNUS |
| Latitude | 54° 36' 2.33'' N |
| Longitude | 2° 11' 46.69'' E |
| Quadrant / block no. | 44 / 11 |
Breached conditions details
| Materials likely to float on sea surface or in water column | No |
|---|---|
| Materials lost to sea resting on sea bed | Yes |
Formal investigation
| Formal investigation ever opened | No |
|---|