IRS/2025/7128/PON2
Notification details
| Status | Completed |
|---|---|
| First observed date | 23 December 2025 |
| First observed time | 15:00 |
| Organisation involved | NEO NEXT ENERGY LIMITED |
| Installation | Piper B Platform |
| Field | PIPER |
| Latitude | 58° 27' 40.0'' N |
| Longitude | 0° 15' 3.0'' E |
| Quadrant / block no. | 15 / 17 |
Breached conditions details
| Materials likely to float on sea surface or in water column | Yes |
|---|---|
| Materials lost to sea resting on sea bed | No |
Formal investigation
| Formal investigation ever opened | No |
|---|