Back

IRS/2026/7307/PON2

Notification details

Status In review
First observed date 12 February 2026
First observed time 09:45
Organisation involved ADURA ENERGY LIMITED
Installation Shearwater C PUQ Platform
Field SHEARWATER
Latitude 57° 1' 53.58'' N
Longitude 1° 57' 19.22'' E
Quadrant / block no. 22 / 30

Breached conditions details

Materials likely to float on sea surface or in water column No
Materials lost to sea resting on sea bed Yes

Formal investigation

Formal investigation ever opened No