Back

IRS/2026/7442/PON2

Notification details

Status Completed
First observed date 19 March 2026
First observed time 21:00
Organisation involved NEO NEXT + ENERGY LIMITED
Installation Global Producer III
Field Dumbarton
Latitude 58° 22' 24.0'' N
Longitude 0° 52' 59.0'' E
Quadrant / block no. 15 / 20

Breached conditions details

Materials likely to float on sea surface or in water column Yes
Materials lost to sea resting on sea bed No

Formal investigation

Formal investigation ever opened No