Back

PON1/2439

Notification details

Status Completed
First observed date 06 November 2013
First observed time 16:40
Incident type(s) Oil release
Organisations involved BHP Billiton
Installation Douglas FPSO OSB
Installation type Fixed
Field DOUGLAS
Latitude 53° 32' 17.0'' N
Longitude 3° 34' 32.0'' W
Quadrant / block no. 110 / 13

Oil release details

Oil product released Mineral Oil
How was the quantity released determined
Total quantity of oil released .053 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Mechanical failure of aft securing chain. Chain was drawn into thruster causing a minor leak from the lip seal.