Back

PON1/2530

Notification details

Status Completed
First observed date 11 December 2013
First observed time 15:15
Incident type(s) Oil release
Organisations involved Talisman Energy (UK) Limited, Talisman Sinopec Energy UK Limited
Installation Arbroath Platform
Installation type Fixed
Field ARBROATH
Latitude 57° 22' 29.084'' N
Longitude 1° 22' 59.036'' E
Quadrant / block no. 22 / 17

Oil release details

Oil product released Oily Waste
How was the quantity released determined
Total quantity of oil released .00124 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source During pressure testing bypass valve left open on pig launcher resulting in release to sea of oily water via drains system.