Back

PON1/1694

Notification details

Status Completed
First observed date 15 March 2013
First observed time 14:00
Incident type(s) Oil release
Organisations involved Talisman Sinopec Energy (UK) Limited, Talisman Energy (UK) Limited
Installation Fulmar A Platform
Installation type Fixed
Field FULMAR
Latitude 56° 29' 37.103'' N
Longitude 2° 9' 16.667'' E
Quadrant / block no. 30 / 16

Oil release details

Oil product released Oily Waste
How was the quantity released determined
Total quantity of oil released .00345 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Deluge testing led to an overflow of hazardous drains tank which in turn overflowed to drainage caisson.