Back

PON1/1752

Notification details

Status Completed
First observed date 07 April 2013
First observed time 20:30
Incident type(s) Oil release
Organisations involved Maersk Oil UK
Installation DSV Polaris over the Balloch P17 Cooling Spool
Installation type Mobile
Field BALLOCH
Latitude 58° 22' 15.14'' N
Longitude 0° 52' 59.57'' E
Quadrant / block no. 15 / 20

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined
Total quantity of oil released .00006 tonnes

Formal investigation

Formal investigation ever opened No

Close off details

Release ever ongoing No

Source details

Source Failure of ferrule on hydraulic hose on pile cutting system.