PON1/1661

Notification details

Status Completed
First observed date 03 March 2013
First observed time 23:25
Incident type(s) Chemical release
Organisations involved Talisman Sinopec Energy (UK) Limited, Talisman Energy (UK) Limited
Installation Buchan A Platform
Installation type Fixed
Field BUCHAN
Latitude 57° 54' 13.008'' N
Longitude 0° 1' 55.066'' E
Quadrant / block no. 21 / 1

Chemical 1

Chemical product released Aqualink 300-F v2
Total quantity of chemical released 1716.78 kg

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source In service failure of 1” 90 degree elbow resulting in the loss of hydraulic fluid inventory from Low Pressure Power Unit header tank and accumulators