Back

PON1/2371

Notification details

Status Completed
First observed date 14 October 2013
First observed time 10:00
Incident type(s) Chemical release
Organisations involved Talisman Sinopec Energy UK Limited, Talisman Energy (UK) Limited
Installation Piper B Platform
Installation type Fixed
Field PIPER
Latitude 58° 27' 40.009'' N
Longitude 0° 15' 3.008'' E
Quadrant / block no. 15 / 17

Chemical 1

Chemical product released HW740 Subsea Production Control Fluid
Total quantity of chemical released 15.6 kg

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Subsea ring main manifold from the Tweedsmuir scale inhibitor line - pinhole leak