Back

PON1/2996

Notification details

Status Completed
First observed date 22 May 2014
First observed time 13:45
Incident type(s) Oil release
Organisations involved Talisman Sinopec Energy UK Ltd, Talisman Energy (UK) Limited
Installation Piper B Platform
Installation type Fixed
Field PIPER
Latitude 58° 27' 40.009'' N
Longitude 0° 15' 3.008'' E
Quadrant / block no. 15 / 17

Oil release details

Oil product released Diesel
How was the quantity released determined
Total quantity of oil released .018585 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Diesel Tank Valve Failure