Back

PON1/2344

Notification details

Status Completed
First observed date 06 October 2013
First observed time 10:00
Incident type(s) Oil release
Organisations involved Talisman Sinopec Energy (UK) Limited, Talisman Energy (UK) Limited
Installation Claymore A Platform
Installation type Fixed
Field CLAYMORE
Latitude 58° 26' 57.545'' N
Longitude 0° 15' 12.985'' W
Quadrant / block no. 14 / 19

Oil release details

Oil product released Diesel
How was the quantity released determined
Total quantity of oil released .002 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Eroded / corroded elbow on below deck drain line