Back

PON1/1894

Notification details

Status Completed
First observed date 24 May 2013
First observed time 11:30
Incident type(s) Oil release
Organisations involved Talisman Energy (UK) Limited
Installation Buchan A Platform
Installation type Fixed
Field BUCHAN
Latitude 57° 54' 13.008'' N
Longitude 0° 1' 55.066'' E
Quadrant / block no. 21 / 1

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined
Total quantity of oil released .0005 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Small bore platform anchor wire tensiometer load cell signal hose split at end ferrule resulting in release to sea.