Back

PON1/3238

Notification details

Status Completed
First observed date 28 July 2014
First observed time 14:30
Incident type(s) Oil release
Organisations involved
Installation Borgsten Dolphin (currently bridge linked to the Dunbar)
Installation type Mobile
Field DUNBAR
Latitude 60° 37' 46.0'' N
Longitude 1° 39' 3.0'' E
Quadrant / block no. 3 / 14

Oil release details

Oil product released Hydraulic Oil
How was the quantity released determined
Total quantity of oil released 0.00008 tonnes

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Burst Hydraulic Pipe On Anchor Winch