Back

PON1/9231

Notification details

Status Completed
First observed date 19 January 2020
First observed time 08:30
Incident type(s) Chemical release
Organisations involved COSL Drilling Europe AS, CNOOC Petroleum Europe Limited
Installation COSLPioneer
Installation type Mobile
Field Buzzard
Latitude 57° 50' 36.0'' N
Longitude 0° 54' 48.0'' W
Quadrant / block no. 20 / 1

Chemical 1

Chemical product released ERIFON HD 603 HP
Total quantity of chemical released 90.0 kg

Chemical 2

Chemical product released ERIFON STACK GLYCOL
Total quantity of chemical released 210.0 kg

Chemical 3

Chemical product released Erifon CLS 40
Total quantity of chemical released 50.0 kg

Formal investigation

Formal investigation ever opened Yes

Close off details

Release ever ongoing No

Source details

Source Bop (Topsides) - Hydraulic System - Corrosion / Erosion