PON10 Data
The following PON10 data is updated with the latest information and published at the start of each day.
Reference | Status | First observed | Organisation involved | Installation | Breach related to | Loss of power | Formal investigation opened | Notification related to |
---|---|---|---|---|---|---|---|---|
IRS/2021/560/PON10 | Completed | 29 December 2021 | PERENCO UK LIMITED | 18A | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2021/559/PON10 | Completed | 29 December 2021 | APACHE NORTH SEA LIMITED | Forties FC Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2021/555/PON10 | Completed | 25 December 2021 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2021/553/PON10 | Completed | 27 December 2021 | SHELL U.K. LIMITED | Carrack | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2021/552/PON10 | Completed | 24 December 2021 | CNR INTERNATIONAL (U.K.) LIMITED | Ninian Central Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2021/549/PON10 | Completed | 26 December 2021 | PERENCO UK LIMITED | Ravenspurn South A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Failure of navigation aids including lights and fog horns, Fog Signals, Secondary Power Supply |
IRS/2021/545/PON10 | Completed | 25 December 2021 | PERENCO UK LIMITED | Leman EP Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Fog Signals, Main Lights, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/544/PON10 | Completed | 26 December 2021 | PERENCO UK LIMITED | Leman J Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2021/543/PON10 | Completed | 25 December 2021 | PERENCO UK LIMITED | Hyde Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Navigation lights on but not flashing, Subsidiary Lights |
IRS/2021/542/PON10 | Completed | 22 December 2021 | PERENCO UK LIMITED | Malory Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2021/541/PON10 | Completed | 24 December 2021 | CHRYSAOR (U.K.) BRITANNIA LIMITED | Britannia Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2021/539/PON10 | Completed | 24 December 2021 | REPSOL RESOURCES UK LIMITED | Beatrice C Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/537/PON10 | Completed | 24 December 2021 | SHELL U.K. LIMITED | Barque PB Platform | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2021/533/PON10 | Completed | 22 December 2021 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Katy Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/532/PON10 | Completed | 22 December 2021 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Kelvin TM Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/524/PON10 | Completed | 21 December 2021 | PERENCO UK LIMITED | Ravenspurn South C Platform | No | |||
IRS/2021/523/PON10 | Completed | 19 December 2021 | SHELL U.K. LIMITED | Brent C Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2021/519/PON10 | Completed | 18 December 2021 | TAQA BRATANI LIMITED | Brae A Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2021/509/PON10 | Completed | 17 December 2021 | PERENCO UK LIMITED | 27H | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Loss of Primary Power, Main Lights, Operations during the Works, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/508/PON10 | Completed | 17 December 2021 | TAQA BRATANI LIMITED | Brae East Platform | No | Main Lights | ||
IRS/2021/504/PON10 | Completed | 17 December 2021 | APACHE BERYL I LIMITED | Beryl A Platform | Consent Condition and Marking Schedule Condition | No | No | Radio and Radar Beacons |
IRS/2021/480/PON10 | Completed | 14 December 2021 | TAQA BRATANI LIMITED | Brae East Platform | No | |||
IRS/2021/478/PON10 | Completed | 14 December 2021 | PERENCO UK LIMITED | Waveney Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Loss of Primary Power, Main Lights, Operations during the Works |
IRS/2021/462/PON10 | Completed | 11 December 2021 | PERENCO UK LIMITED | Malory Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works |
IRS/2021/461/PON10 | Completed | 12 December 2021 | PERENCO UK LIMITED | Excalibur A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works |
IRS/2021/452/PON10 | Completed | 09 December 2021 | PERENCO UK LIMITED | Hyde Platform | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2021/450/PON10 | Completed | 04 December 2021 | CHRYSAOR PETROLEUM COMPANY U.K. LIMITED | Valaris 121 | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2021/445/PON10 | Completed | 07 December 2021 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Tethys Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | black in water |
IRS/2021/440/PON10 | Completed | 06 December 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Secondary Power Supply |
IRS/2021/439/PON10 | Completed | 06 December 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Secondary Power Supply |
IRS/2021/436/PON10 | Completed | 06 December 2021 | PERENCO UK LIMITED | Lancelot Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works |
IRS/2021/435/PON10 | Completed | 05 December 2021 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 Q Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/429/PON10 | Completed | 04 December 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP3 Platform | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2021/428/PON10 | Completed | 05 December 2021 | CHRYSAOR (U.K.) BRITANNIA LIMITED | Britannia Platform | Consent Condition excluding Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2021/426/PON10 | Completed | 26 November 2021 | SHELL U.K. LIMITED | Brent C Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/421/PON10 | Completed | 04 December 2021 | PERENCO UK LIMITED | Excalibur A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works, Secondary Lights |
IRS/2021/415/PON10 | Completed | 03 December 2021 | BP EXPLORATION OPERATING COMPANY LIMITED | Marnock ETAP PDR Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2021/396/PON10 | Completed | 30 November 2021 | EQUINOR UK LIMITED | Rosebank | Consent Condition excluding Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2021/393/PON10 | Completed | 30 November 2021 | PERENCO UK LIMITED | Davy | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/390/PON10 | Completed | 28 November 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2021/389/PON10 | Completed | 28 November 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2021/388/PON10 | Completed | 28 November 2021 | CNR INTERNATIONAL (U.K.) LIMITED | Tiffany Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/387/PON10 | Completed | 27 November 2021 | TAQA BRATANI LIMITED | Harding Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/383/PON10 | Completed | 22 September 2021 | SHELL U.K. LIMITED | Valaris 122 | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2021/379/PON10 | Completed | 26 November 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Millom West Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2021/369/PON10 | Completed | 23 November 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe North Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2021/368/PON10 | Completed | 23 November 2021 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2021/360/PON10 | Completed | 23 November 2021 | PERENCO UK LIMITED | Neptune Platform | No | |||
IRS/2021/353/PON10 | Completed | 22 November 2021 | REPSOL RESOURCES UK LIMITED | Montrose A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/341/PON10 | Completed | 20 November 2021 | SHELL U.K. LIMITED | Carrack QA Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2021/324/PON10 | Completed | 17 November 2021 | PERENCO UK LIMITED | 23D | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/323/PON10 | Completed | 17 November 2021 | PERENCO UK LIMITED | 27H | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Secondary Power Supply |
IRS/2021/320/PON10 | Completed | 15 November 2021 | TOTALENERGIES E&P UK LIMITED | West Franklin WHP | No | Secondary Lights | ||
IRS/2021/318/PON10 | Completed | 16 November 2021 | REPSOL NORTH SEA LIMITED | Fulmar A Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2021/315/PON10 | Completed | 16 November 2021 | PERENCO UK LIMITED | Hoton | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2021/313/PON10 | Completed | 16 November 2021 | CNOOC PETROLEUM EUROPE LIMITED | Buzzard Sweetening Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/311/PON10 | Completed | 14 November 2021 | ITHACA ENERGY (UK) LIMITED | Stella FPF-1 | Consent Condition excluding Marking Schedule Condition | No | No | Secondary Power Supply |
IRS/2021/301/PON10 | Completed | 14 November 2021 | PERENCO UK LIMITED | Pickerill A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/292/PON10 | Completed | 12 November 2021 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2021/288/PON10 | Completed | 11 November 2021 | CHRYSAOR PETROLEUM COMPANY U.K. LIMITED | Valaris 121 | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2021/278/PON10 | Completed | 11 November 2021 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Boulton Wellhead Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/262/PON10 | Completed | 07 November 2021 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/250/PON10 | Completed | 06 November 2021 | PERENCO UK LIMITED | Malory Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Fog Signals, Main Lights |
IRS/2021/234/PON10 | Completed | 02 November 2021 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Tethys Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/224/PON10 | Completed | 01 November 2021 | INEOS FPS LIMITED | Forties Unity Riser Platform | Consent Condition excluding Marking Schedule Condition | No | No | Secondary Lights |
IRS/2021/223/PON10 | Completed | 02 November 2021 | BP EXPLORATION OPERATING COMPANY LIMITED | Andrew Platform | Consent Condition excluding Marking Schedule Condition | No | No | Identification Panels |
IRS/2021/215/PON10 | Completed | 01 November 2021 | ENI UK LIMITED | Hamilton A Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2021/208/PON10 | Completed | 31 October 2021 | SHELL U.K. LIMITED | Clipper PC Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/202/PON10 | Completed | 30 October 2021 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals, Operations during the Works |
IRS/2021/198/PON10 | Completed | 27 October 2021 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, primary power supply failure, Secondary Lights, Secondary Power Supply |
IRS/2021/195/PON10 | Completed | 29 October 2021 | SPIRIT ENERGY RESOURCES LIMITED | York NUI | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2021/181/PON10 | Completed | 23 October 2021 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 C Platform | Consent Condition excluding Marking Schedule Condition | No | No | loss of main power, Main Lights |
IRS/2021/136/PON10 | Completed | 18 October 2021 | ONE-DYAS UK LIMITED | Sean PP Platform | Consent Condition excluding Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2021/135/PON10 | Completed | 16 October 2021 | ODE ASSET MANAGEMENT LIMITED | Tolmount NUI Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Description of Works, Fog Signals, Main Lights, Secondary Lights, Subsidiary Lights |
IRS/2021/134/PON10 | Completed | 18 October 2021 | SHELL U.K. LIMITED | Clipper PC Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/130/PON10 | Completed | 16 October 2021 | THREE60 OPERATIONS SERVICES LIMITED | Ketch A Platform | Consent Condition excluding Marking Schedule Condition | No | No | 1 hour without ERRV (mitigation while NavAid system being replaced) |
IRS/2021/122/PON10 | Completed | 16 October 2021 | SHELL U.K. LIMITED | Leman G Platform [SHELL] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2021/110/PON10 | Completed | 10 October 2021 | SHELL U.K. LIMITED | Charlie platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/109/PON10 | Completed | 07 October 2021 | PERENCO UK LIMITED | 49/27J | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2021/107/PON10 | Completed | 12 October 2021 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Tethys Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Fog Signals, Primary Power Supply |
IRS/2021/89/PON10 | Completed | 10 October 2021 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAA Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/77/PON10 | Completed | 03 October 2021 | CHRYSAOR (U.K.) BRITANNIA LIMITED | Britannia Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2021/44/PON10 | Completed | 01 October 2021 | SHELL U.K. LIMITED | Brent C Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2021/40/PON10 | Completed | 01 October 2021 | PERENCO UK LIMITED | Davy AMOSS Platform | No | Main AC Power, Main Lights, Secondary Lights, Secondary Power Supply | ||
IRS/2021/27/PON10 | Completed | 27 September 2021 | SHELL U.K. LIMITED | Corvette Platform | Consent Condition and Marking Schedule Condition | No | No | Alarm for NavAids faulty |
IRS/2021/1/PON10 | Completed | 22 September 2021 | SHELL U.K. LIMITED | Shearwater C PUQ Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |