Reference | Status | First observed | Organisation involved | Installation | Breach related to | Loss of power | Formal investigation opened | Notification related to |
---|---|---|---|---|---|---|---|---|
IRS/2022/2275/PON10 | Completed | 31 December 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe North Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2272/PON10 | Completed | 29 December 2022 | PERENCO UK LIMITED | Amethyst A1D Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/2268/PON10 | Completed | 28 December 2022 | TOTALENERGIES E&P NORTH SEA UK LIMITED | Ailsa FSO | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/2267/PON10 | Completed | 28 December 2022 | PERENCO UK LIMITED | Pickerill A Jacket Location | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2022/2266/PON10 | Completed | 28 December 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe North Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2256/PON10 | Completed | 23 December 2022 | ENI UK LIMITED | Douglas DW Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Power Supply |
IRS/2022/2250/PON10 | In review | 21 December 2022 | CNR INTERNATIONAL (U.K.) LIMITED | Petrojarl Banff | Consent Condition excluding Marking Schedule Condition | No | No | |
IRS/2022/2238/PON10 | Completed | 19 December 2022 | PERENCO UK LIMITED | 27C | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/2235/PON10 | Completed | 19 December 2022 | ONE-DYAS UK LIMITED | Sean RD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/2234/PON10 | Completed | 19 December 2022 | ITHACA ENERGY (UK) LIMITED | Anglia A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/2231/PON10 | Completed | 19 December 2022 | CHRYSAOR (U.K.) BRITANNIA LIMITED | Britannia Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/2230/PON10 | Completed | 18 December 2022 | CENTRICA ENERGY STORAGE LIMITED | Rough CD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/2216/PON10 | Completed | 14 December 2022 | APACHE NORTH SEA LIMITED | Forties FD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/2200/PON10 | Completed | 12 December 2022 | SHELL U.K. LIMITED | LEMAN CHARLIE | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2180/PON10 | Completed | 08 December 2022 | SPIRIT ENERGY NORTH SEA LIMITED | Chiswick Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2022/2176/PON10 | Completed | 06 December 2022 | TAQA BRATANI LIMITED | Harding Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/2167/PON10 | Completed | 03 December 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 C Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works |
IRS/2022/2160/PON10 | Completed | 03 December 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2159/PON10 | Completed | 03 December 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2158/PON10 | Completed | 03 December 2022 | PERENCO UK LIMITED | Waveney Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2136/PON10 | Completed | 02 November 2022 | PERENCO UK LIMITED | 18B | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/2126/PON10 | Completed | 27 November 2022 | ODE ASSET MANAGEMENT LIMITED | Wenlock Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2124/PON10 | Completed | 27 November 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2123/PON10 | Completed | 27 November 2022 | ENI UK LIMITED | Hamilton North Platform | No | Main Lights | ||
IRS/2022/2112/PON10 | Completed | 27 November 2022 | PERENCO UK LIMITED | Leman EP Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2102/PON10 | Completed | 25 November 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 AP Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works, Primary Power Supply, Subsidiary Lights |
IRS/2022/2098/PON10 | Completed | 23 November 2022 | PERENCO UK LIMITED | Trent Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals, Main Lights |
IRS/2022/2081/PON10 | Completed | 19 November 2022 | SHELL U.K. LIMITED | Barque PB Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/2072/PON10 | Completed | 16 November 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2067/PON10 | Completed | 16 November 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/2065/PON10 | Completed | 17 November 2022 | PERENCO UK LIMITED | 30A | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/2063/PON10 | Completed | 16 November 2022 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/2062/PON10 | Completed | 16 November 2022 | ENI UK LIMITED | Douglas DW Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/2042/PON10 | Completed | 12 November 2022 | APACHE NORTH SEA LIMITED | Forties FB Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/2039/PON10 | Completed | 12 November 2022 | PERENCO UK LIMITED | Waveney Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/2038/PON10 | Completed | 11 November 2022 | PERENCO UK LIMITED | Galahad Template | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights, Secondary Lights, Secondary Power Supply |
IRS/2022/2036/PON10 | Completed | 12 November 2022 | ENQUEST HEATHER LIMITED | Magnus Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/2031/PON10 | Completed | 10 November 2022 | SPIRIT ENERGY RESOURCES LIMITED | Grove Wellhead Platform | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/2029/PON10 | Completed | 02 November 2022 | PERENCO UK LIMITED | 18B | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/2023/PON10 | Completed | 06 November 2022 | PERENCO UK LIMITED | 23D | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights, Primary Power Supply |
IRS/2022/2015/PON10 | Completed | 07 November 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 C Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works, Primary Power Supply |
IRS/2022/2010/PON10 | Completed | 06 November 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Kelvin TM Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/1997/PON10 | Completed | 01 November 2022 | REPSOL RESOURCES UK LIMITED | Bleo Holm FPSO | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1987/PON10 | Completed | 01 November 2022 | ANASURIA OPERATING COMPANY LIMITED | Anasuria FPSO | Consent Condition and Marking Schedule Condition | No | No | Operations during the Works, Subsidiary Lights |
IRS/2022/1980/PON10 | Completed | 31 October 2022 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAA Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1975/PON10 | Completed | 30 October 2022 | ENI UK LIMITED | Hamilton North Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/1972/PON10 | Completed | 30 October 2022 | INEOS FPS LIMITED | Forties Unity Riser Platform | Consent Condition excluding Marking Schedule Condition | No | No | Radio and Radar Beacons |
IRS/2022/1971/PON10 | Completed | 29 October 2022 | PERENCO UK LIMITED | Hyde Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2022/1959/PON10 | Completed | 23 August 2022 | ITHACA ENERGY (UK) LIMITED | Stella FPF-1 | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1945/PON10 | Completed | 23 October 2022 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/1942/PON10 | Completed | 14 October 2022 | ENI ENERGY E&P UK LIMITED | Cygnus QU Platform | No | |||
IRS/2022/1935/PON10 | Completed | 20 October 2022 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1929/PON10 | Completed | 18 October 2022 | APACHE BERYL I LIMITED | Beryl SPM2 Loading Terminal | Consent Condition and Marking Schedule Condition | No | No | Fog Signals, Subsidiary Lights |
IRS/2022/1918/PON10 | Completed | 11 September 2022 | REPSOL RESOURCES UK LIMITED | Montrose A Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2022/1915/PON10 | Completed | 17 October 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Andrew Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1912/PON10 | Completed | 16 October 1970 | ENI UK LIMITED | Hamilton North Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1910/PON10 | Completed | 14 October 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe North Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Primary Power Supply |
IRS/2022/1902/PON10 | Completed | 13 October 2022 | TOTALENERGIES E&P UK LIMITED | Elgin Wellhead Platform B | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1893/PON10 | Completed | 09 October 2022 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAB Platform | No | |||
IRS/2022/1888/PON10 | Completed | 06 October 2022 | REPSOL RESOURCES UK LIMITED | Piper B Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2022/1878/PON10 | Completed | 03 October 2022 | CNR INTERNATIONAL (U.K.) LIMITED | Ninian Southern Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1874/PON10 | Completed | 08 October 2022 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Secondary Power Supply |
IRS/2022/1869/PON10 | Completed | 02 October 2022 | INEOS FPS LIMITED | Forties Unity Riser Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1862/PON10 | Completed | 04 October 2022 | PERENCO UK LIMITED | Ravenspurn South B Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1861/PON10 | Completed | 05 October 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Kelvin TM Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/1853/PON10 | Completed | 03 October 2022 | PERENCO UK LIMITED | Inde BP Platform (PERENCO) | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Primary Power Supply, Secondary Power Supply |
IRS/2022/1840/PON10 | Completed | 30 September 2022 | APACHE NORTH SEA LIMITED | Forties FB Platform | Consent Condition excluding Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/1837/PON10 | Completed | 30 September 2022 | TAQA BRATANI LIMITED | Harding Offshore Loading Syste | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2022/1819/PON10 | Completed | 27 September 2022 | ENI UK LIMITED | Douglas DA Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/1815/PON10 | Completed | 25 September 2022 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1812/PON10 | Completed | 24 September 2022 | PERENCO UK LIMITED | 27F | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/1770/PON10 | Completed | 14 September 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Boulton Wellhead Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply |
IRS/2022/1763/PON10 | Completed | 08 June 2022 | SHELL U.K. LIMITED | Leman G Platform [SHELL] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1756/PON10 | Completed | 12 September 2022 | ENI UK LIMITED | Douglas OSI | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1754/PON10 | Completed | 11 September 2022 | PERENCO GAS (UK) LIMITED | Neptune Platform | No | Primary Power Supply | ||
IRS/2022/1750/PON10 | Completed | 11 September 2022 | TAQA BRATANI LIMITED | Tern Platform | Consent Condition and Marking Schedule Condition | No | No | Battery |
IRS/2022/1740/PON10 | Completed | 09 September 2022 | CNOOC PETROLEUM EUROPE LIMITED | Buzzard Utilities Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1737/PON10 | Completed | 07 September 2022 | SERICA ENERGY (UK) LIMITED | Bruce | No | Main Lights | ||
IRS/2022/1733/PON10 | Completed | 07 September 2022 | HARBOUR ENERGY PLC | Britannia Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1710/PON10 | Completed | 29 August 2022 | CNR INTERNATIONAL (U.K.) LIMITED | Banff | Consent Condition excluding Marking Schedule Condition | No | No | Location of Works |
IRS/2022/1694/PON10 | Completed | 27 August 2022 | INEOS UK SNS LIMITED | Cavendish Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Description of Works |
IRS/2022/1690/PON10 | Completed | 29 August 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Boulton Wellhead Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1682/PON10 | Completed | 28 August 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Marnock ETAP PDR Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1679/PON10 | Completed | 28 August 2022 | PERENCO UK LIMITED | West Sole WB Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights |
IRS/2022/1668/PON10 | Completed | 25 August 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/1666/PON10 | Completed | 24 August 2022 | ENI UK LIMITED | Douglas DW Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1660/PON10 | Completed | 23 August 2022 | SHELL U.K. LIMITED | Leman G Platform [SHELL] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/1643/PON10 | Completed | 21 August 2022 | PERENCO GAS (UK) LIMITED | 18B | No | |||
IRS/2022/1639/PON10 | Completed | 19 August 2022 | SHELL U.K. LIMITED | Carrack QA Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Subsidiary Lights |
IRS/2022/1605/PON10 | Completed | 10 August 2022 | ENI UK LIMITED | Lennox Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1604/PON10 | Completed | 10 August 2022 | ENI UK LIMITED | Irish Sea Pioneer | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/1600/PON10 | Completed | 08 August 2022 | CENTRICA ENERGY STORAGE LIMITED | Rough BD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1592/PON10 | Completed | 05 August 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP4 Platform | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2022/1580/PON10 | Completed | 06 August 2022 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/1574/PON10 | Completed | 05 August 2022 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAA Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1573/PON10 | Completed | 05 August 2022 | PERENCO UK LIMITED | Ravenspurn South B Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1560/PON10 | Completed | 03 August 2022 | PERENCO UK LIMITED | Amethyst A1D Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals, Subsidiary Lights |
IRS/2022/1555/PON10 | Completed | 02 August 2022 | PERENCO UK LIMITED | Ravenspurn North ST3 Platform | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1551/PON10 | Completed | 01 August 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Kittiwake A Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2022/1545/PON10 | Completed | 31 July 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1531/PON10 | Completed | 27 July 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works, Primary Power Supply |
IRS/2022/1530/PON10 | Completed | 26 July 2022 | CHRYSAOR (U.K.) BRITANNIA LIMITED | Britannia Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/1529/PON10 | Completed | 25 July 2022 | ENI UK LIMITED | Hamilton A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights |
IRS/2022/1514/PON10 | Completed | 19 July 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Kelvin TM Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights, Subsidiary Lights |
IRS/2022/1511/PON10 | Completed | 19 July 2022 | TOTALENERGIES E&P NORTH SEA UK LIMITED | Culzean Processing Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/1510/PON10 | Completed | 19 July 2022 | SPIRIT ENERGY RESOURCES LIMITED | York NUI | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1509/PON10 | Completed | 19 July 2022 | SPIRIT ENERGY RESOURCES LIMITED | York NUI | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1508/PON10 | Completed | 23 June 2022 | SHELL U.K. LIMITED | Clipper PC Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1503/PON10 | Completed | 17 July 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1500/PON10 | Completed | 17 July 2022 | PERENCO UK LIMITED | Ravenspurn North ST3 Platform | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1499/PON10 | Completed | 16 July 2022 | ENI UK LIMITED | Douglas OSI | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1496/PON10 | Completed | 15 July 2022 | REPSOL RESOURCES UK LIMITED | Bleo Holm FPSO | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1493/PON10 | Completed | 14 July 2022 | TOTALENERGIES E&P UK LIMITED | Franklin Wellhead Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1487/PON10 | Completed | 15 July 2022 | CHRYSAOR RESOURCES (IRISH SEA) LIMITED | Millom West Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/1480/PON10 | Completed | 11 July 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/1477/PON10 | Completed | 09 July 2022 | REPSOL RESOURCES UK LIMITED | Auk A Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1465/PON10 | Completed | 10 July 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1464/PON10 | Completed | 09 July 2022 | TAQA BRATANI LIMITED | Tern Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1459/PON10 | Completed | 08 July 2022 | REPSOL RESOURCES UK LIMITED | Montrose A Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1458/PON10 | Completed | 09 July 2022 | CENTRICA ENERGY STORAGE LIMITED | Rough AD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Power Supply |
IRS/2022/1455/PON10 | Completed | 08 July 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Boulton Wellhead Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/1444/PON10 | Completed | 05 July 2022 | SERICA ENERGY (UK) LIMITED | bruce | No | |||
IRS/2022/1441/PON10 | Completed | 04 July 2022 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAB Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1436/PON10 | Completed | 04 July 2022 | SPIRIT ENERGY RESOURCES LIMITED | York NUI | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1426/PON10 | Completed | 02 July 2022 | PERENCO UK LIMITED | 27J | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1421/PON10 | Completed | 11 April 2022 | CHRYSAOR RESOURCES (IRISH SEA) LIMITED | Millom West Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/1399/PON10 | Completed | 25 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Millom West Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/1398/PON10 | Completed | 27 June 2022 | PERENCO UK LIMITED | Ravenspurn North ST2 Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1389/PON10 | Completed | 25 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/1388/PON10 | Completed | 25 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/1387/PON10 | Completed | 25 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/1360/PON10 | Completed | 18 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1358/PON10 | Completed | 19 June 2022 | PERENCO UK LIMITED | 27H | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/1344/PON10 | Completed | 16 June 2022 | PERENCO UK LIMITED | West Sole WC Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Power Supply |
IRS/2022/1343/PON10 | Completed | 14 June 2022 | PERENCO UK LIMITED | Neptune Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2022/1339/PON10 | Completed | 14 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/1338/PON10 | Completed | 14 June 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/1300/PON10 | Completed | 05 June 2022 | SHELL U.K. LIMITED | Gannet A Platform | Consent Condition excluding Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1287/PON10 | Completed | 02 June 2022 | EQUINOR UK LIMITED | Mariner PDQ Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights, Primary Power Supply |
IRS/2022/1282/PON10 | Completed | 02 June 2022 | SHELL U.K. LIMITED | Brent C Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1281/PON10 | Completed | 02 June 2022 | PERENCO UK LIMITED | 27J | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1273/PON10 | In review | 31 May 2022 | REPSOL RESOURCES UK LIMITED | Tartan A Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2022/1253/PON10 | Completed | 27 May 2022 | ITHACA ENERGY (UK) LIMITED | Anglia A Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2022/1252/PON10 | Completed | 26 May 2022 | ODE ASSET MANAGEMENT LIMITED | Wenlock Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/1247/PON10 | Completed | 25 May 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | No | No | Operations during the Works, Subsidiary Lights |
IRS/2022/1245/PON10 | Completed | 25 May 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Mungo NUI Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1243/PON10 | Completed | 25 May 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1231/PON10 | Completed | 22 May 2022 | SHELL U.K. LIMITED | Leman G Platform [SHELL] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1226/PON10 | Completed | 20 May 2022 | TOTALENERGIES E&P UK LIMITED | Dunbar Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main and Subsidiary Lights |
IRS/2022/1221/PON10 | Completed | 11 May 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Ensco 92 | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2022/1220/PON10 | Completed | 06 March 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe North Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1216/PON10 | Completed | 09 March 2022 | PETRODEC UK LIMITED | Amethyst A2D Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights, Operations during the Works, Secondary Lights |
IRS/2022/1211/PON10 | Completed | 15 May 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Millom West Platform | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply |
IRS/2022/1207/PON10 | Completed | 14 May 2022 | PERENCO UK LIMITED | West Sole WC Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/1185/PON10 | Completed | 11 May 2022 | PERENCO UK LIMITED | 27J | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/1183/PON10 | Completed | 23 August 2022 | PERENCO UK LIMITED | 27G | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1177/PON10 | Completed | 09 May 2022 | TOTALENERGIES E&P NORTH SEA UK LIMITED | Ailsa FSO | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1163/PON10 | In review | 04 May 2022 | REPSOL RESOURCES UK LIMITED | Tartan A Platform | Consent Condition and Marking Schedule Condition | No | No | |
IRS/2022/1128/PON10 | Completed | 28 April 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Marnock ETAP PDR Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1120/PON10 | Completed | 27 April 2022 | SHELL U.K. LIMITED | Corvette Platform | Consent Condition and Marking Schedule Condition | No | No | Light failure alarm |
IRS/2022/1116/PON10 | Completed | 25 April 2022 | SHELL U.K. LIMITED | Galleon PG Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Main Lights |
IRS/2022/1111/PON10 | Completed | 24 April 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Boulton Wellhead Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1110/PON10 | Completed | 24 April 2022 | SHELL U.K. LIMITED | Barque PL Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights, Subsidiary Lights |
IRS/2022/1093/PON10 | Completed | 20 April 2022 | SERICA ENERGY (UK) LIMITED | Bruce D Platform | No | |||
IRS/2022/1089/PON10 | Completed | 19 April 2022 | SHELL U.K. LIMITED | Leman CP Platform [SHELL] | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1083/PON10 | Completed | 18 April 2022 | SHELL U.K. LIMITED | Brigantine BR | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2022/1082/PON10 | Completed | 18 April 2022 | CHRYSAOR PETROLEUM COMPANY U.K. LIMITED | Judy Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1080/PON10 | Completed | 16 April 2022 | EQUINOR UK LIMITED | Edda Flora | Consent Condition excluding Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2022/1070/PON10 | Completed | 15 April 2022 | PERENCO UK LIMITED | Neptune Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1066/PON10 | Completed | 15 April 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition excluding Marking Schedule Condition | No | No | Operations during the Works, Primary Power Supply |
IRS/2022/1050/PON10 | Completed | 11 April 2022 | REPSOL RESOURCES UK LIMITED | Montrose A Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2022/1046/PON10 | Completed | 11 April 2022 | PERENCO UK LIMITED | Ravenspurn North ST2 Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2022/1039/PON10 | Completed | 11 April 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Millom West Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2022/1030/PON10 | Completed | 09 April 2022 | PERENCO UK LIMITED | Ravenspurn South B Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1024/PON10 | Completed | 07 April 2022 | SHELL U.K. LIMITED | Golf platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/1021/PON10 | Completed | 05 April 2022 | APACHE BERYL I LIMITED | Beryl SPM3 Loading Terminal | Consent Condition and Marking Schedule Condition | No | No | Mooring and Buoys |
IRS/2022/1016/PON10 | Completed | 05 April 2022 | TOTALENERGIES E&P UK LIMITED | West Franklin WHP | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/1008/PON10 | Completed | 02 April 2022 | NEO ENERGY PRODUCTION UK LIMITED | Global Producer III | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/989/PON10 | Completed | 31 March 2022 | PERENCO UK LIMITED | 18B | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/987/PON10 | Completed | 31 March 2022 | PERENCO UK LIMITED | 27E | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/973/PON10 | Completed | 27 March 2022 | ITHACA ENERGY (UK) LIMITED | Stella FPF-1 | Consent Condition excluding Marking Schedule Condition | No | No | obstruction lights linked to AtoN controller |
IRS/2022/972/PON10 | Completed | 28 March 2022 | TOTALENERGIES E&P UK LIMITED | Alwyn North NAB Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/971/PON10 | Completed | 27 March 2022 | SHELL U.K. LIMITED | Brent C Platform | Consent Condition and Marking Schedule Condition | No | No | Secondary Lights |
IRS/2022/966/PON10 | Completed | 27 March 2022 | PERENCO UK LIMITED | 27J | Consent Condition and Marking Schedule Condition | No | No | Fog Signals, Subsidiary Lights |
IRS/2022/965/PON10 | Completed | 27 March 2022 | PERENCO UK LIMITED | 27D | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2022/964/PON10 | Completed | 27 March 2022 | PERENCO UK LIMITED | 27E | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/963/PON10 | Completed | 27 March 2022 | PERENCO UK LIMITED | 27f | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/959/PON10 | Completed | 26 March 2022 | APACHE BERYL I LIMITED | Beryl SPM2 Loading Terminal | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/949/PON10 | Completed | 24 March 2022 | SPIRIT ENERGY NORTH SEA LIMITED | Chiswick Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/939/PON10 | Completed | 22 March 2022 | REPSOL RESOURCES UK LIMITED | Saltire A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/923/PON10 | Completed | 17 March 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Clair Ridge Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/921/PON10 | Completed | 17 March 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 AP Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works |
IRS/2022/904/PON10 | Completed | 14 March 2022 | REPSOL RESOURCES UK LIMITED | Tartan A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main 15 mile Lanterns power supply tripped |
IRS/2022/898/PON10 | Completed | 06 March 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe North Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/892/PON10 | Completed | 10 March 2022 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/883/PON10 | Completed | 28 February 2022 | ENQUEST HEATHER LIMITED | Thistle A Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/882/PON10 | Completed | 08 March 2022 | CHRYSAOR PETROLEUM COMPANY U.K. LIMITED | Judy Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2022/881/PON10 | Completed | 08 March 2022 | CHRYSAOR PETROLEUM COMPANY U.K. LIMITED | Judy Platform | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/877/PON10 | Completed | 05 March 2022 | SHELL U.K. LIMITED | Charlie | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works, Subsidiary Lights, Syncing issue |
IRS/2022/872/PON10 | Completed | 05 March 2022 | PERENCO UK LIMITED | Inde D Platform (PERENCO) | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Operations during the Works, Primary Power Supply |
IRS/2022/840/PON10 | Completed | 27 February 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Munro MH Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals |
IRS/2022/836/PON10 | Completed | 27 February 2022 | PERENCO UK LIMITED | Neptune Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/835/PON10 | Completed | 27 February 2022 | PERENCO UK LIMITED | Ravenspurn South C Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/834/PON10 | Completed | 27 February 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Calder | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/832/PON10 | Completed | 25 February 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/827/PON10 | Completed | 23 February 2022 | REPSOL RESOURCES UK LIMITED | Arbroath Platform | Consent Condition excluding Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/824/PON10 | Completed | 24 February 2022 | ODE ASSET MANAGEMENT LIMITED, NEO ENERGY (SNS) LIMITED | Babbage Platform | No | |||
IRS/2022/822/PON10 | Completed | 23 February 2022 | PETROFAC FACILITIES MANAGEMENT LIMITED | Hewett 48/29 B Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Fog Signals, Main Lights, Operations during the Works, Primary Power Supply |
IRS/2022/803/PON10 | Completed | 19 February 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/798/PON10 | Completed | 19 February 2022 | ODE ASSET MANAGEMENT LIMITED | Tolmount NUI Platform | Consent Condition excluding Marking Schedule Condition | No | No | Main Lights |
IRS/2022/784/PON10 | Completed | 15 February 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Andrew Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/783/PON10 | Completed | 13 February 2022 | SHELL U.K. LIMITED | Brent C Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/775/PON10 | Completed | 12 February 2022 | SPIRIT ENERGY NORTH SEA LIMITED | Chiswick Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/764/PON10 | Completed | 09 February 2022 | CENTRICA ENERGY STORAGE LIMITED | Rough CD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights |
IRS/2022/763/PON10 | Completed | 10 February 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Munro MH Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals |
IRS/2022/762/PON10 | Completed | 10 February 2022 | CHRYSAOR PRODUCTION (U.K.) LIMITED | Tethys Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals |
IRS/2022/758/PON10 | Completed | 08 February 2022 | SHELL U.K. LIMITED | Ensco 122 | Consent Condition and Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/757/PON10 | Completed | 08 February 2022 | PERENCO UK LIMITED | Inde AQ Platform (PERENCO) | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/751/PON10 | Completed | 08 February 2022 | PERENCO UK LIMITED | Neptune Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/745/PON10 | Completed | 06 February 2022 | PERENCO UK LIMITED | Trent Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/740/PON10 | Completed | 05 February 2022 | SHELL U.K. LIMITED | Barque PL Platform | Consent Condition and Marking Schedule Condition | No | No | Primary Power Supply, Secondary Power Supply |
IRS/2022/719/PON10 | Completed | 31 January 2022 | CNOOC PETROLEUM EUROPE LIMITED | Golden Eagle PUQ Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Main Lights, Primary Power Supply |
IRS/2022/714/PON10 | Completed | 30 January 2022 | ODE ASSET MANAGEMENT LIMITED | Wenlock Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/713/PON10 | Completed | 31 January 2022 | PERENCO UK LIMITED | 18B | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Operations during the Works |
IRS/2022/700/PON10 | Completed | 29 January 2021 | APACHE NORTH SEA LIMITED | Forties FE Platform | Consent Condition and Marking Schedule Condition | No | No | Identification Panels |
IRS/2022/691/PON10 | Completed | 25 January 2022 | ENI UK LIMITED | Douglas FPF Irish Sea Pioneer | Consent Condition excluding Marking Schedule Condition | No | No | Lights not synchronised |
IRS/2022/676/PON10 | Completed | 22 January 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP6 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/675/PON10 | Completed | 21 January 2022 | SPIRIT ENERGY PRODUCTION UK LIMITED | Morecambe South DP8 Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/670/PON10 | Completed | 14 January 2022 | ODE ASSET MANAGEMENT LIMITED | Southwark Platform | Consent Condition excluding Marking Schedule Condition | No | No | Description of Works |
IRS/2022/654/PON10 | Completed | 18 January 2022 | REPSOL RESOURCES UK LIMITED | Beatrice C Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/635/PON10 | Completed | 15 January 2022 | PERENCO UK LIMITED | Ravenspurn North CPP Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/609/PON10 | Completed | 10 January 2022 | SHELL U.K. LIMITED | Carrack QA Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Primary Power Supply |
IRS/2022/608/PON10 | Completed | 10 January 2022 | CENTRICA ENERGY STORAGE LIMITED | Rough AD Platform | Consent Condition and Marking Schedule Condition | No | No | Main Lights, Secondary Lights |
IRS/2022/605/PON10 | Completed | 08 January 2022 | PERENCO UK LIMITED | Pickerill A Platform | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights |
IRS/2022/600/PON10 | Completed | 08 January 2022 | SHELL U.K. LIMITED | Galleon PG Platform | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/595/PON10 | Completed | 06 January 2021 | SHELL U.K. LIMITED | Golf | Consent Condition and Marking Schedule Condition | No | No | Fog Signals |
IRS/2022/589/PON10 | Completed | 05 January 2022 | FAIRFIELD BETULA LIMITED | Dunlin A Platform | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Primary Power Supply |
IRS/2022/585/PON10 | Completed | 05 January 2022 | BP EXPLORATION OPERATING COMPANY LIMITED | Glen Lyon FPSO | Consent Condition excluding Marking Schedule Condition | No | No | Subsidiary Lights |
IRS/2022/582/PON10 | Completed | 04 January 2022 | PERENCO UK LIMITED | 18B | Consent Condition and Marking Schedule Condition | Yes, primary only | No | Fog Signals, Loss of Primary Power, Main Lights, Operations during the Works |
IRS/2022/575/PON10 | Completed | 03 January 2022 | PERENCO UK LIMITED | Leman H Platform [PERENCO] | Consent Condition and Marking Schedule Condition | Yes, primary and secondary power | No | Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply |