PON10 Data

The following PON10 data is updated with the latest information and published at the start of each day.

Download
Reference Status First observed Organisation involved Installation Breach related to Loss of power Formal investigation opened Notification related to
IRS/2023/3840/PON10 Completed 31 December 2023 ODE ASSET MANAGEMENT LIMITED Southwark Platform No
IRS/2023/3836/PON10 Completed 28 December 2023 PERENCO UK LIMITED Inde 49/18 Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/3835/PON10 Completed 28 December 2023 PERENCO UK LIMITED Excalibur A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/3833/PON10 Completed 28 December 2023 TAQA BRATANI LIMITED Harding Platform Consent Condition and Marking Schedule Condition No No Identification Panels
IRS/2023/3823/PON10 Completed 27 December 2023 REPSOL RESOURCES UK LIMITED Tartan A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/3816/PON10 Completed 25 December 2023 SPIRIT ENERGY RESOURCES LIMITED Grove Wellhead Platform Consent Condition and Marking Schedule Condition Yes, primary only No Main Lights
IRS/2023/3806/PON10 In review 21 December 2023 CNR INTERNATIONAL (U.K.) LIMITED Banff SSIV Skid Consent Condition excluding Marking Schedule Condition No No
IRS/2023/3803/PON10 In review 18 December 2023 APACHE BERYL I LIMITED Beryl SPM2 Loading Terminal Consent Condition and Marking Schedule Condition No No
IRS/2023/3798/PON10 Completed 20 December 2023 SHELL U.K. LIMITED Leman CP Platform [SHELL] Consent Condition and Marking Schedule Condition Yes, primary only No Main Lights, Operations during the Works, Primary Power Supply, Subsidiary Lights
IRS/2023/3790/PON10 Completed 17 December 2023 REPSOL RESOURCES UK LIMITED Saltire A Platform Consent Condition and Marking Schedule Condition No No Main Lights, Operations during the Works, Subsidiary Lights
IRS/2023/3781/PON10 Completed 16 December 2023 ENI UK LIMITED Douglas FPF Irish Sea Pioneer Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3773/PON10 Completed 14 December 2023 SPIRIT ENERGY RESOURCES LIMITED Chiswick Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3764/PON10 Completed 11 December 2023 REPSOL RESOURCES UK LIMITED Tartan A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/3743/PON10 Completed 05 December 2023 PERENCO UK LIMITED 18B No Subsidiary Lights
IRS/2023/3736/PON10 Completed 05 December 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 C Platform Consent Condition and Marking Schedule Condition No No Main Lights, Operations during the Works
IRS/2023/3718/PON10 Completed 01 December 2023 SHELL U.K. LIMITED Skiff PS Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3717/PON10 Completed 30 November 2023 CHRYSAOR NORTH SEA LIMITED Armada Platform Consent Condition and Marking Schedule Condition No No Identification Panels, Operations during the Works
IRS/2023/3715/PON10 In review 13 February 2024 PERENCO UK LIMITED Trent Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No
IRS/2023/3713/PON10 Completed 30 November 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Kittiwake A Platform Consent Condition and Marking Schedule Condition No No Identification Panels, Identification Panels lighting, Operations during the Works
IRS/2023/3710/PON10 Completed 29 November 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Calder Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3708/PON10 Completed 28 November 2023 ENI UK LIMITED Hamilton North Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3697/PON10 Completed 26 November 2023 TAQA BRATANI LIMITED Brae A Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3692/PON10 Completed 25 November 2023 PERENCO UK LIMITED Malory Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3691/PON10 Completed 24 November 2023 PERENCO UK LIMITED Neptune Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/3690/PON10 Completed 25 November 2023 PERENCO UK LIMITED Inde AC Platform (PERENCO) Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3676/PON10 In review 22 November 2023 REPSOL RESOURCES UK LIMITED Bleo Holm FPSO Consent Condition and Marking Schedule Condition No No
IRS/2023/3673/PON10 Completed 21 November 2023 REPSOL RESOURCES UK LIMITED Tartan A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/3655/PON10 Completed 18 November 2023 SHELL U.K. LIMITED Shamrock QS Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3639/PON10 Completed 13 November 2023 ODE ASSET MANAGEMENT LIMITED, PETROFAC FACILITIES MANAGEMENT LIMITED, IOG, ODE ASSET MANAGEMENT LIMITED, ODE ASSET MANAGEMENT LIMITED Southwark Platform No
IRS/2023/3637/PON10 Completed 06 November 2023 THREE60 ENERGY WELLS UK LIMITED Valaris Norway Consent Condition and Marking Schedule Condition No No Identification Panels
IRS/2023/3625/PON10 Completed 27 October 2023 EQUINOR UK LIMITED Mariner FSU Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/3606/PON10 Completed 25 June 2023 ITHACA OIL AND GAS LIMITED Alba Northern Platform Consent Condition and Marking Schedule Condition No No Secondary Power Supply
IRS/2023/3585/PON10 Completed 05 November 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Calder No
IRS/2023/3578/PON10 Completed 04 November 2023 BP EXPLORATION OPERATING COMPANY LIMITED Clair Phase 1 Platform Consent Condition excluding Marking Schedule Condition No No Main Lights
IRS/2023/3570/PON10 Completed 29 October 2023 PERENCO UK LIMITED Leman G Platform [PERENCO] Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/3566/PON10 Completed 03 November 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 52/5 A Platform Consent Condition and Marking Schedule Condition No No Main Lights, Operations during the Works
IRS/2023/3560/PON10 Completed 02 November 2023 ITHACA ENERGY (UK) LIMITED Captain FPSO Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3558/PON10 Completed 31 October 2023 REPSOL RESOURCES UK LIMITED Tartan A Platform Consent Condition and Marking Schedule Condition No No Primary Power Supply
IRS/2023/3550/PON10 Completed 31 October 2023 SHELL U.K. LIMITED Barque PB Platform Consent Condition and Marking Schedule Condition Yes, primary only No Main Lights, Subsidiary Lights
IRS/2023/3534/PON10 In review 28 October 2023 CENTRICA ENERGY STORAGE LIMITED Rough BD Platform Consent Condition and Marking Schedule Condition Yes, primary only No
IRS/2023/3530/PON10 Completed 28 October 2023 PERENCO UK LIMITED Trent Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3529/PON10 Completed 29 October 2023 PERENCO UK LIMITED Davy Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3521/PON10 Completed 19 June 2023 ITHACA ENERGY (UK) LIMITED Captain WPP'A' Consent Condition and Marking Schedule Condition No No Secondary Power Supply
IRS/2023/3514/PON10 Completed 18 October 2023 PERENCO UK LIMITED 27H Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/3513/PON10 Completed 23 October 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Calder Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3512/PON10 Completed 23 October 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Morecambe South DP8 Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3506/PON10 Completed 19 October 2023 CNOOC PETROLEUM EUROPE LIMITED Buzzard Production Platform Consent Condition and Marking Schedule Condition No No Main Lights, Subsidiary Lights
IRS/2023/3505/PON10 Completed 24 October 2023 APACHE BERYL I LIMITED Beryl SPM3 Loading Terminal Consent Condition and Marking Schedule Condition No No Mooring and Buoys
IRS/2023/3483/PON10 Completed 19 October 2023 PERENCO UK LIMITED 23C Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3482/PON10 Completed 20 October 2023 PERENCO UK LIMITED 23D Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3481/PON10 Completed 19 October 2023 PERENCO UK LIMITED 27J Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3474/PON10 Completed 20 October 2023 TOTALENERGIES E&P UK LIMITED Elgin WHP A Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/3471/PON10 Completed 20 October 2023 CNR INTERNATIONAL (U.K.) LIMITED Petrojarl Banff Consent Condition excluding Marking Schedule Condition No No Mooring and Buoys
IRS/2023/3460/PON10 Completed 18 October 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Morecambe South DP8 Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3455/PON10 Completed 17 October 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Morecambe South DP6 Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3451/PON10 Completed 17 October 2023 SPIRIT ENERGY RESOURCES LIMITED, SPIRIT ENERGY RESOURCES LIMITED Grove Wellhead Platform No Primary Power Supply
IRS/2023/3450/PON10 Completed 17 October 2023 REPSOL RESOURCES UK LIMITED Saltire A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/3443/PON10 Completed 15 October 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Morecambe South DP8 Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/3436/PON10 Completed 02 October 2023 PERENCO UK LIMITED Bessemer Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/3426/PON10 Completed 13 October 2023 REPSOL NORTH SEA LIMITED Fulmar A Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/3425/PON10 Completed 10 October 2023 BP EXPLORATION OPERATING COMPANY LIMITED Clair Phase 1 Platform No
IRS/2023/3423/PON10 Completed 11 October 2023 BP EXPLORATION OPERATING COMPANY LIMITED Andrew Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3418/PON10 Completed 09 October 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Morecambe South DP8 Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3410/PON10 Completed 09 October 2023 SPIRIT ENERGY RESOURCES LIMITED Grove Wellhead Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3397/PON10 Completed 07 October 2023 TAQA BRATANI LIMITED Brae East Platform Consent Condition and Marking Schedule Condition Yes, primary only No Main Lights
IRS/2023/3381/PON10 Completed 02 October 2023 REPSOL RESOURCES UK LIMITED Tartan A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/3378/PON10 Completed 01 October 2023 ENI ENERGY E&P UK LIMITED Cygnus B Platform Consent Condition excluding Marking Schedule Condition No No Primary Power Supply
IRS/2023/3377/PON10 Completed 29 September 2023 SHELL U.K. LIMITED Clipper PW Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/3374/PON10 Completed 24 September 2023 REPSOL RESOURCES UK LIMITED Montrose A Platform Consent Condition and Marking Schedule Condition Yes, primary only No Main Lights
IRS/2023/3313/PON10 Completed 15 September 2023 REPSOL RESOURCES UK LIMITED Piper B Platform Consent Condition and Marking Schedule Condition Yes, primary only No Subsidiary Lights
IRS/2023/3297/PON10 Completed 10 September 2023 ENI UK LIMITED Douglas DD Platform Consent Condition excluding Marking Schedule Condition No No Secondary Power Supply
IRS/2023/3283/PON10 Completed 09 September 2023 SPIRIT ENERGY NORTH SEA LIMITED Chiswick Platform Consent Condition excluding Marking Schedule Condition No No Primary Power Supply
IRS/2023/3282/PON10 Completed 08 September 2023 PERENCO UK LIMITED Leman H Platform [PERENCO] Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3280/PON10 Completed 08 September 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Morecambe South DP8 Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3278/PON10 Completed 07 September 2023 SPIRIT ENERGY PRODUCTION UK LIMITED Calder Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3277/PON10 Completed 08 September 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 AP Platform Consent Condition and Marking Schedule Condition No No Fog Signals, Main Lights, Operations during the Works, Secondary Lights, Subsidiary Lights, synchronisation with Drilling Rig
IRS/2023/3265/PON10 Completed 28 August 2023 ENI UK LIMITED Lennox Platform Consent Condition and Marking Schedule Condition No No Secondary Power Supply
IRS/2023/3262/PON10 Completed 04 September 2023 CHRYSAOR PRODUCTION (U.K.) LIMITED Katy Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Fog Signals, Main Lights, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/3253/PON10 In review 03 September 2023 CENTRICA ENERGY STORAGE LIMITED Rough AD Platform Consent Condition and Marking Schedule Condition No No
IRS/2023/3222/PON10 Completed 28 August 2023 BP EXPLORATION OPERATING COMPANY LIMITED Mungo NUI Platform Consent Condition and Marking Schedule Condition No No Main Lights, Subsidiary Lights
IRS/2023/3202/PON10 Completed 22 August 2023 PERENCO UK LIMITED 27e Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3189/PON10 Completed 18 August 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 C Platform No Fog Signals, Maintenance Management, Primary Power Supply, Secondary Lights, Subsidiary Lights
IRS/2023/3175/PON10 Completed 14 August 2023 ODE ASSET MANAGEMENT LIMITED Wenlock Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/3169/PON10 Completed 12 August 2023 SHELL U.K. LIMITED Caravel QR Consent Condition and Marking Schedule Condition No No Main Lights, Secondary Lights
IRS/2023/3153/PON10 Completed 06 August 2023 PERENCO UK LIMITED 23C Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3147/PON10 Completed 05 August 2023 REPSOL NORTH SEA LIMITED Fulmar A Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/3133/PON10 Completed 03 August 2023 NEO ENERGY PRODUCTION UK LIMITED Global Producer III Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/3129/PON10 Completed 02 August 2023 SHELL U.K. LIMITED Skiff PS Platform Consent Condition and Marking Schedule Condition No No Main Lights, Subsidiary Lights
IRS/2023/3099/PON10 Completed 24 July 2023 PERENCO UK LIMITED Cleeton Compression Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3089/PON10 Completed 21 July 2023 PERENCO UK LIMITED 27J Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3050/PON10 Completed 11 July 2023 APACHE BERYL I LIMITED Beryl A Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3042/PON10 Completed 09 July 2023 PERENCO UK LIMITED DAVY Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3031/PON10 Completed 07 July 2023 PERENCO UK LIMITED 18B Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3026/PON10 Completed 06 July 2023 DANA PETROLEUM (E&P) LIMITED Valaris 121 Consent Condition excluding Marking Schedule Condition No No Mooring and Buoys
IRS/2023/3019/PON10 Completed 05 July 2023 PERENCO UK LIMITED 23D Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/3017/PON10 Completed 04 July 2023 ENQUEST HEATHER LIMITED Thistle A Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/3002/PON10 Completed 03 July 2023 PERENCO UK LIMITED Davy Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2980/PON10 Completed 27 June 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 C Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/2974/PON10 Completed 26 June 2023 PERENCO UK LIMITED DAVY Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2973/PON10 Completed 25 June 2023 PERENCO UK LIMITED 27H Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/2972/PON10 Completed 22 June 2023 PERENCO UK LIMITED 27G Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2966/PON10 Completed 22 June 2023 PERENCO UK LIMITED Hyde Platform Consent Condition and Marking Schedule Condition No No Main Lights, Subsidiary Lights
IRS/2023/2962/PON10 Completed 23 June 2023 APACHE NORTH SEA LIMITED Forties FE Platform Consent Condition excluding Marking Schedule Condition No No Main Lights
IRS/2023/2954/PON10 Completed 21 June 2023 TOTALENERGIES E&P NORTH SEA UK LIMITED Culzean Utilities Living Quart Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2947/PON10 Completed 19 June 2023 PERENCO UK LIMITED 23D Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2946/PON10 Completed 18 June 2023 ODE ASSET MANAGEMENT LIMITED Southwark Platform No
IRS/2023/2942/PON10 Completed 16 June 2023 REPSOL RESOURCES UK LIMITED Saltire A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2935/PON10 Completed 18 June 2023 PERENCO UK LIMITED 27J Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2904/PON10 Completed 10 June 2023 TOTALENERGIES E&P UK LIMITED Dunbar Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2902/PON10 Completed 10 June 2023 PERENCO UK LIMITED Waveney Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2894/PON10 Completed 08 June 2023 PERENCO UK LIMITED 27H Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/2872/PON10 Completed 30 May 2023 ODE ASSET MANAGEMENT LIMITED Southwark Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2867/PON10 Completed 01 June 2023 SERICA ENERGY (UK) LIMITED, SERICA ENERGY (UK) LIMITED Bruce PUQ Platform No
IRS/2023/2861/PON10 Completed 27 May 2023 REPSOL RESOURCES UK LIMITED Saltire A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2859/PON10 Completed 30 May 2023 PERENCO UK LIMITED Davy Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2843/PON10 Completed 25 May 2023 REPSOL RESOURCES UK LIMITED Piper B Platform Consent Condition and Marking Schedule Condition No No Secondary Lights
IRS/2023/2826/PON10 Completed 19 May 2023 PERENCO UK LIMITED 23C Consent Condition and Marking Schedule Condition No No Main Lights, Secondary Lights
IRS/2023/2820/PON10 Completed 17 May 2023 PERENCO UK LIMITED West Sole WC Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2800/PON10 Completed 11 May 2023 ODE ASSET MANAGEMENT LIMITED Garrow Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2798/PON10 In review 10 May 2023 BP EXPLORATION OPERATING COMPANY LIMITED Clair Phase 1 Platform Consent Condition excluding Marking Schedule Condition No No
IRS/2023/2794/PON10 Completed 08 May 2023 ODE ASSET MANAGEMENT LIMITED, PETROFAC FACILITIES MANAGEMENT LIMITED, ODE ASSET MANAGEMENT LIMITED Southwark Platform No
IRS/2023/2778/PON10 Completed 07 May 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 C Platform No Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/2773/PON10 Completed 05 May 2023 TAQA BRATANI LIMITED Brae East Platform Consent Condition excluding Marking Schedule Condition No No Main Lights
IRS/2023/2772/PON10 Completed 06 May 2023 PERENCO UK LIMITED 27J Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2769/PON10 Completed 05 May 2023 PERENCO UK LIMITED 27G Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2767/PON10 Completed 04 May 2023 PERENCO UK LIMITED 27H Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2761/PON10 Completed 02 May 2023 PERENCO UK LIMITED 30A (DAVY) Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2760/PON10 Completed 30 April 2023 INEOS FPS LIMITED Forties Unity Riser Platform Consent Condition excluding Marking Schedule Condition No No Radio and Radar Beacons
IRS/2023/2750/PON10 Completed 17 April 2023 CNR INTERNATIONAL (U.K.) LIMITED Banff Consent Condition excluding Marking Schedule Condition No No Location of Works
IRS/2023/2736/PON10 Completed 29 April 2023 BP EXPLORATION OPERATING COMPANY LIMITED Glen Lyon FPSO Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2728/PON10 Completed 26 April 2023 REPSOL RESOURCES UK LIMITED Saltire A Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/2706/PON10 Completed 21 April 2023 CHRYSAOR PRODUCTION (U.K.) LIMITED Kelvin TM Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/2693/PON10 Completed 18 April 2023 CHRYSAOR RESOURCES (IRISH SEA) LIMITED Millom West Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/2691/PON10 Completed 17 April 2023 ONE-DYAS UK LIMITED Sean RD Platform Consent Condition and Marking Schedule Condition No No Secondary Power Supply
IRS/2023/2690/PON10 Completed 16 April 2023 PERENCO UK LIMITED 23c Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2685/PON10 Completed 16 April 2023 ONE-DYAS UK LIMITED Sean RD Platform Consent Condition and Marking Schedule Condition No No Mooring and Buoys
IRS/2023/2680/PON10 Completed 13 April 2023 REPSOL RESOURCES UK LIMITED Piper B Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2679/PON10 Completed 13 April 2023 APACHE BERYL I LIMITED Beryl A Platform Consent Condition and Marking Schedule Condition No No Radio and Radar Beacons
IRS/2023/2678/PON10 Completed 13 April 2023 CHRYSAOR RESOURCES (IRISH SEA) LIMITED Millom West Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/2677/PON10 Completed 13 April 2023 REPSOL RESOURCES UK LIMITED Claymore A Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2673/PON10 Completed 11 April 2023 ODE ASSET MANAGEMENT LIMITED Kilmar Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2672/PON10 Completed 11 April 2023 PERENCO UK LIMITED Minerva Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply, Secondary Power Supply
IRS/2023/2648/PON10 Completed 08 April 2023 ENI UK LIMITED Douglas OSI Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2642/PON10 Completed 06 April 2023 CHRYSAOR PRODUCTION (U.K.) LIMITED Kelvin TM Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2640/PON10 In review 04 April 2023 PERENCO UK LIMITED Hyde Platform Consent Condition and Marking Schedule Condition No No
IRS/2023/2639/PON10 Completed 03 April 2023 PERENCO UK LIMITED 27J Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2635/PON10 Completed 02 April 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 C Platform No
IRS/2023/2619/PON10 Completed 30 March 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Paul B. Loyd, Jnr Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2618/PON10 Completed 30 March 2023 REPSOL RESOURCES UK LIMITED Piper B Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2597/PON10 Completed 22 March 2023 SPIRIT ENERGY RESOURCES LIMITED York NUI Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2588/PON10 Completed 21 March 2023 PERENCO UK LIMITED Inde D Platform (PERENCO) Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2571/PON10 Completed 19 March 2023 SHELL U.K. LIMITED Skiff PS Platform Consent Condition and Marking Schedule Condition No No Main Lights, Secondary Lights
IRS/2023/2567/PON10 Completed 19 March 2023 PERENCO UK LIMITED Amethyst A1D Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2563/PON10 Completed 16 March 2023 PERENCO UK LIMITED Ravenspurn South B Platform Consent Condition and Marking Schedule Condition No No Main Lights, Subsidiary Lights
IRS/2023/2542/PON10 Completed 12 March 2023 TOTALENERGIES E&P UK LIMITED Elgin PUQ Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2538/PON10 Completed 10 March 2023 PERENCO UK LIMITED Leman H Platform [PERENCO] Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2535/PON10 In review 09 March 2023 ODE ASSET MANAGEMENT LIMITED Garrow Platform Consent Condition and Marking Schedule Condition Yes, primary only No
IRS/2023/2533/PON10 Completed 09 March 2023 PERENCO UK LIMITED Leman J Platform [PERENCO] Consent Condition and Marking Schedule Condition No No Main Lights, Primary Power Supply
IRS/2023/2514/PON10 Completed 05 March 2023 SPIRIT ENERGY NORTH SEA LIMITED Chiswick Platform Consent Condition excluding Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2494/PON10 Completed 02 March 2023 SPIRIT ENERGY RESOURCES LIMITED York NUI Consent Condition and Marking Schedule Condition No No Secondary Power Supply
IRS/2023/2487/PON10 Completed 26 February 2023 IOG PLC, ODE ASSET MANAGEMENT LIMITED Southwark Platform No
IRS/2023/2466/PON10 Completed 19 February 2023 PERENCO UK LIMITED Waveney Platform Consent Condition and Marking Schedule Condition No No Main Lights, Secondary Lights
IRS/2023/2463/PON10 Completed 18 February 2023 TAQA BRATANI LIMITED Harding Platform Consent Condition and Marking Schedule Condition No No Secondary Lights
IRS/2023/2447/PON10 Completed 15 February 2023 ENI UK LIMITED Hamilton North Platform Consent Condition and Marking Schedule Condition No No Identification Panels
IRS/2023/2425/PON10 Completed 11 February 2023 ENI UK LIMITED Douglas OSI Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2422/PON10 Completed 12 December 2022 ENI UK LIMITED Lennox Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2421/PON10 Completed 12 December 2022 ENI UK LIMITED Lennox Platform Consent Condition and Marking Schedule Condition No No Identification Panels
IRS/2023/2420/PON10 Completed 12 December 2022 ENI UK LIMITED Hamilton A Platform Consent Condition and Marking Schedule Condition No No Identification Panels
IRS/2023/2414/PON10 Completed 06 February 2023 ENI UK LIMITED Hamilton North Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2403/PON10 Completed 04 February 2023 CHRYSAOR PETROLEUM COMPANY U.K. LIMITED Jasmine LQ Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2387/PON10 Completed 31 January 2023 FAIRFIELD BETULA LIMITED Dunlin A Platform Consent Condition and Marking Schedule Condition Yes, primary only No Fog Signals, Main Lights, Primary Power Supply
IRS/2023/2383/PON10 Completed 31 January 2023 PERENCO UK LIMITED Ravenspurn North ST2 Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2382/PON10 Completed 30 January 2023 TOTALENERGIES E&P UK LIMITED Alwyn North NAB Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2380/PON10 Completed 30 January 2023 PERENCO UK LIMITED Waveney Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Primary Power Supply
IRS/2023/2377/PON10 Completed 29 January 2023 APACHE NORTH SEA LIMITED Forties FE Platform Consent Condition excluding Marking Schedule Condition No No Main Lights
IRS/2023/2375/PON10 Completed 22 September 2022 BP EXPLORATION OPERATING COMPANY LIMITED Clair Ridge Platform Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2362/PON10 Completed 24 January 2023 PERENCO UK LIMITED 23C Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2358/PON10 Completed 24 January 2023 PETROFAC FACILITIES MANAGEMENT LIMITED Hewett 48/29 B Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Fog Signals, Main Lights, Operations during the Works, Primary Power Supply, Secondary Lights, Secondary Power Supply, Subsidiary Lights
IRS/2023/2357/PON10 Completed 22 January 2023 BP EXPLORATION OPERATING COMPANY LIMITED Glen Lyon FPSO Consent Condition excluding Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2354/PON10 Completed 22 January 2023 SHELL U.K. LIMITED SOLEPIT PG PLATFORM [SHELL] Consent Condition and Marking Schedule Condition No No Main Lights
IRS/2023/2353/PON10 Completed 22 January 2023 SHELL U.K. LIMITED Leman E Platform [SHELL] Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2347/PON10 Completed 20 January 2023 APACHE NORTH SEA LIMITED Forties FC Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2346/PON10 Completed 19 January 2023 SPIRIT ENERGY NORTH SEA LIMITED Chiswick Platform Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2339/PON10 Completed 18 January 2023 TOTALENERGIES E&P UK LIMITED Alwyn North NAA Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2327/PON10 Completed 16 January 2023 BP EXPLORATION OPERATING COMPANY LIMITED Mungo NUI Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Subsidiary Lights
IRS/2023/2318/PON10 Completed 15 January 2023 CHRYSAOR PETROLEUM COMPANY U.K. LIMITED Judy Platform Consent Condition and Marking Schedule Condition No No Identification Panels
IRS/2023/2312/PON10 Completed 13 January 2023 REPSOL RESOURCES UK LIMITED Beatrice C Platform Consent Condition and Marking Schedule Condition Yes, primary and secondary power No Main Lights
IRS/2023/2299/PON10 Completed 07 January 2023 ENI UK LIMITED Hamilton North Platform Consent Condition and Marking Schedule Condition No No Subsidiary Lights
IRS/2023/2292/PON10 Completed 04 January 2023 ITHACA ENERGY (UK) LIMITED Captain WPP'A' Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2289/PON10 Completed 04 January 2023 SERICA ENERGY (UK) LIMITED Paul B. Loyd, Jnr Consent Condition and Marking Schedule Condition No No Main Lights, Subsidiary Lights
IRS/2023/2288/PON10 Completed 02 January 2023 ENQUEST HEATHER LIMITED Heather A Platform Consent Condition and Marking Schedule Condition No No Fog Signals
IRS/2023/2286/PON10 Completed 01 January 2023 PERENCO UK LIMITED Leman 27E Consent Condition and Marking Schedule Condition Yes, primary only No Primary Power Supply
IRS/2023/2282/PON10 Completed 01 January 2023 PERENCO UK LIMITED 18A Consent Condition and Marking Schedule Condition Yes, primary only No Secondary Lights
IRS/2023/2281/PON10 Completed 02 January 2023 PERENCO UK LIMITED 27D Consent Condition and Marking Schedule Condition No No Fog Signals